Anonymous

FRS/GMRS Radio Mapping Guide: Difference between revisions

From WikiNET
m
mNo edit summary
Line 83: Line 83:
Additional elements of the Survey Action Plan should include instructions for using Survey Log forms and Survey Area Map.  
Additional elements of the Survey Action Plan should include instructions for using Survey Log forms and Survey Area Map.  


The Radio Coverage Survey Action Plan, including radio protocols, should be reviewed with survey participants in a NET meeting before the first radio mapping session. Additionally, survey participants should review the action plan before each session. A sample Radio Coverage Survey Action Plan is available as a fillable form in the table above, and can be modified for the NET Service Area surveyed.
The Radio Coverage Survey Action Plan, including radio protocols, should be reviewed with survey participants in a NET meeting before the first radio mapping session. Additionally, survey participants should review the action plan before each session. A sample Radio Coverage Survey Action Plan is available as a fillable form in the table above [[Media:2024.11.10.Radio Mapping Action Plan.pdf|or download here]], and can be modified for the NET Service Area surveyed.


== Notes and References ==
== Notes and References ==
<references />
<references />