Operations at BEECN Sites: Difference between revisions

From Portland NET Wiki
Line 9: Line 9:


=== BEECN Operational Periods and Shifts ===
=== BEECN Operational Periods and Shifts ===
a. The operational period for a BEECN is from 0600 to 2200, and BEECNs will not operate from 2200 to 0600 (with the next operational period starting at 0600); unless otherwise specified by PBEM.


b. Each operational period is divided into two shifts: Shift A and Shift B. Shift A runs from 0600 to 1400, and Shift B runs from 1400 to 2200.
# The operational period for a BEECN is from 0600 to 2200, and BEECNs will not operate from 2200 to 0600 (with the next operational period starting at 0600); unless otherwise specified by PBEM.
# Each operational period is divided into two shifts: Shift A and Shift B. Shift A runs from 0600 to 1400, and Shift B runs from 1400 to 2200.


=== Deployment Protocols ===
=== Deployment Protocols ===
The radio network for BEECNs is activated 24 to 48 hours following a catastrophic earthquake that has shut down communications systems such as cell phones and landlines. Therefore, BEECN volunteers must expect to self deploy without a direct request from PBEM or other government authority. Volunteers should self-deploy to the BEECN cache and set up at the BEECN site if, and only if, the following conditions are met:
The radio network for BEECNs is activated 24 to 48 hours following a catastrophic earthquake that has shut down communications systems such as cell phones and landlines. Therefore, BEECN volunteers must expect to self deploy without a direct request from PBEM or other government authority. Volunteers should self-deploy to the BEECN cache and set up at the BEECN site if, and only if, the following conditions are met:


a. A major earthquake has occurred in the Portland area.
# A major earthquake has occurred in the Portland area.
 
# The volunteer and their family are not in immediate danger, and are not injured.
b. The volunteer and his or her family are not in any immediate danger, and are not injured.
# Communication systems (such as land lines) are inoperative.
 
c. Communication systems (such as land lines) are inoperative.
 
d. Volunteers have received no direct instructions from PBEM or other government authority.


=== Responsibilities Prior to Deployment ===
=== Responsibilities Prior to Deployment ===
Immediately following an earthquake, BEECN volunteers:
Immediately following an earthquake, BEECN volunteers:


a. Check themselves for injuries and ensure personal safety.
# Check themselves for injuries and ensure personal safety.
 
# Check in with household members, ensure their safety, and treat any injuries.
b. Check in with household members, ensure their safety, and treat any injuries.
# Deploy to BEECN cache if it is safe to do so, and set it up at the BEECN site.
 
c. Deploy to BEECN cache if it is safe to do so, and set it up at the BEECN site.


=== Self Determination to Deploy ===
=== Self Determination to Deploy ===
Individual volunteers maintain personal discretion to deploy when the self- deployment protocols are met as described in 300.15. The decision to deploy following a disaster is a volunteer’s own, and a volunteer may never be coerced into deploying. A volunteer who chooses not to deploy will not be subject to any consequences related to his or her standing in the BEECN program.
Individual volunteers have personal discretion to deploy when the self- deployment protocols are met [[Operations at BEECN Sites|as described above]]. The decision to deploy following a disaster is a volunteer’s own, and a volunteer may never be coerced into deploying. A volunteer who chooses not to deploy will not be subject to any consequences related to his or her standing in the BEECN program.


=== Deployment Guiding Principles ===
=== Deployment Guiding Principles ===